    1 project design conditions

    1.1 projects of heat condition

    The steam source conditions: saturated steam 0.1 MPa. A, 100 ℃, for compressed to 0.45 MPa. A, 145 ℃, steam 4 t/h;

    Project name: screw compressor steam compression recovery project.

    1.2 project construction site:

    Installation location: design of unit installed near a owner waste heat sources of heat/steam plant.

    1.3 the power requirements (can be adjusted according to the actual circumstance of the owner)

    Screw compressor steam for electricity provided by the user is responsible for:

    (1) control power supply: ac power AC380V, 3 phase, 50 hz;

    (2) the power supply: compressor body and auxiliary power adopts ac power AC10000V, 3 phase, 50 hz;

    1.4 water requirement (can be adjusted according to the actual circumstance of the owner)

    Screw water vapor compressor mainly include: the unit steam humidity adjusting water;Mechanical seal with circulating cooling water;Lubricating oil system in circulating cooling water three parts.

    The unit steam humidity control water use oxygen or boiler feed water;

    Mechanical seal with use demineralized water circulating cooling water;

    Lubricating oil system using cold water circulation industry cooling water;According to the industrial circulating cooling water treatment design specification (GB 50050-2007), cooling water water quality must meet the following requirements, can also according to the local water quality, but shall not be lower than in the table below standard:

    ITEM

    Allowed values

    turbidity

    ≤6 NTU

    hardness

    ≤150 mg/L

    Total alkalinity

    ≤200mg/L

    PH (25℃)

    6.8~9.5

    The oil content

    ≤1.6mg/L

    The temperature

    ≤30 ℃

    Cl2

    0.06~0.33mg/L

    Fe

    ≤0.33 mg/L

    Cu

    ≤0.033 mg/L

    Cl-

    ≤233 mg/L

    S2O4-+Cl-

    ≤833 mg/L

    SiO2

    ≤58 mg/L

    Mg2+×SiO2

    ≤16000 mg/L

    NH3-N

    ≤3.3 mg/L

    COD5

    ≤3mg/L

    2 equipment selection scheme

    2.1 the screw compressor design parameters of steam

    According to the heat source parameters and user requirements, design steam into screw compressor compression parameters after the ascension, compressed steam back to users continue to use the steam equipment.

    Item

    SREW  STEAM  AIR COMPRESSOR

    SREW  STEAM  AIR COMPRESSOR

    MODEL

    XR-190-700

    QTY

    1  SET

    The steam humidity adjusting the parameters of the warm water reduction

    (optional)

    Pressure:MPa.a

    >0.5

    The temperature:℃

    102

    The amount of water:t/h

    0.5

    Design inlet pressure:MPa.A

    0.1

    Design inlet temperature:℃

    100

    Design into the steam dryness:

    0.9

    The design of exhaust steam pressure:MPa.A

    0.45

    The design of exhaust steam temperature:℃

    145

    Compressed steam:t/h

    4

    Compressor rated speed:r/min

    3000

    Compressor shaft power:kw

    655

    Frequency modulation motor

    POWER:kW 

    700

    Voltage:V

    10KV

    frequency:Hz

    30~50

    2.2 Screw compressor equipment of steam

    Item

    Name

    MODEL

    QYT

    UNIT

    FACTORY

    1

    Screw compressor unit of steam

    XR190—700(The whole device prizing)

    1

    SET

    SHANGHAI XINRAN

    1.1

    MOTOR

    XR190

    1

    PC

    SHANGHAI XINRAN

    1.2

    PLCControl cabinet and the instrument

    XR-TK

    1

    SET

    SHANGHAI XINRAN

    1.3

    Lubricating oil system

    With the host device prizing

    1

    SET

    SHANGHAI

    XINRAN

    1.4

    Seal cooling water system

    With the host device prizing

    1

    PC

    SHANGHAI

    XINRAN

    1.5

    VSD MOTOR

    700kW-10KV

    1

    SET

    HENGSHUI MOTOR

    1.6

    The inverter

    700kW-INVERTOR MOTOR

    1

    PC

    XIWANG LANSEN

    1.7

    Steam humidity control system

    With the host device prizing

    1

    SET

    SHANGHAI XIRAN

    1.8

    Steam accumulator tank (inlet)


    1

    PC

    SHENYANG RELI

    1.9

    Steam buffer tank


    1

    PC

    SHENYANG RELI

    1.10

    Interface accessories

    Interface companion flange, fasteners, anchor bolt, and sealing gasket

    1

    PC

    SHANGHAI XINRAN

    2.3 Equipment process

    Note: the figure only said related system schematic diagram, see configuration table scope of supply.

    Unit for main equipment overall dimensions and weight: (dimension estimates, specific length will be subject to the final design)

    ITEM

    NAME

    MODEL

    SIZE(M)

    QTY

    WEIGHT(T)

    1

    Screw compressor unit of steam

    XR-190-700

    5.5×2×2.5

    1SET

    10

    2

    PLC Control cabinet and the instrument

    XR-TK

    0.8×0.6×2.2

    1SET

    0.4

    3

    Inverter



    1SET


    4

    Steam accumulator tank (inlet)



    1SET


    5

    Steam buffer tank



    1SET


    Generating set around the room not less than 1.5 m, speed regulation and grid-connection control cabinet installed near the equipment for field observation operation control.

    2.4 Lubricating oil system

    Screw the lubricating oil system of steam compressor adopts circulation lubrication method, form a complete set of integrated lubricating oil system.

    Three screw pump oil pump selection, operation, low noise, stable flow, can undertake high speed over a long period of time. Essential oil filter adopts double barrel oil filter, but in the case of non-stop switch to clean oil absorption, oil filter, guarantee the oil circulation is not affected.

    Lubricating oil is chosen N46 turbine oil, work in high temperature has good emulsification oxidation resistance, lubricating oil pressure control in 0.1 ~ 0.3 MPa.Because oil circulation for a long time after use to cause a decline in the quality, in order to ensure the lubrication system of good lubrication effect, lubricating oil should be replaced periodically, design of lubricating oil use period for 1 year.

    2.5 the cooling water system

    2.5.1 steam humidity control system

    Unit water steam humidity control, to ensure that the unit compressed gas parameters of steam temperature to satisfy the user requirements, to prevent exhaust overheating, ensure the security and stability of equipment operation.To avoid impact on compressed steam quality, humidity control water use oxygen/boiler feed water, provided by the user is responsible for.(parameters demanded to see the public media 2.6)

    2.5.2 mechanical seal cooling system

    Owner directly provide demineralized water, used in mechanical seal cooling unit.(parameters demanded to see the public media 2.6)

    2.5.3 oil cooling

    Using external loop to provide cooling to form a complete set of lubricating oil system, industrial cooling water provided by the user is responsible for.(parameters demanded to see the public media 2.6)

    2.6 equipment public medium parameters and consumption

    Unit to ensure safe and stable operation, but also must provide aided engineering medium for unit operations, the parameters are as follow:

    ITEM

    PROJECT

    PARAMENT

    1

    Industrial circulating cooling water

    Tempreture:℃

    ≤ 30

    pressure:MPa.G

    0.2~0.5

    Oil system of circulating water:t/h

    6

    2

    Demineralized water

    Mechanical seal (cooling)

    Tempreture:℃

    ≤ 35

    pressure:MPa.G

    0.2~0.5

    Machine seal cooling water circulation:t/h

    6

    3

    eduction of warm water

    (with the exception of oxygen water/desalted water)

    Tempreture:℃

    102

    pressure:MPa.G

    > 0.5

    water:t/h

    0.5

    4

    Control power

    Frequency:Hz

    50±1

    voltage:V

    AC380V±10%

    POWER:kW

    10

    5

    MOTOR POWER

    frequency:Hz

    50±1

    voltage:V

    AC10kV±10%

    power:kW

    800

    6

    Lubricating oil

    model:

    46#compresor oil

    installation of lubricating oil:L

    500

    Oil circulation quantity:L/min

    80

    3implementation plan

    3.1 items and contents to be provided by users

    1) The user provides the construction site of screw steam compressor unit;

    2) The deoxygenated water, circulating cooling water and demineralized water required by the unit are connected by the user to one meter outside the corresponding access pipe of the unit, or to the corresponding inlet interface flange of the unit;

    3) The heat source steam pipe is provided by the user and connected to the inlet flange of the screw steam compressor unit;

    4) The user is responsible for the cable laying from the user's on-site power distribution cabinet to the screw steam compressor unit;

    5) All energy media required on site are provided by users (including steam, circulating industrial cooling water, demineralized water, deaerated water, instrument air or compressed air, control and power supply, etc.).

    3.2 contents provided by the supplier

    1) According to the steam source conditions, we provide: screw steam compressor unit, speed control system, frequency conversion regulation system, import and export steam liquid separation tank and other equipment supply;

    2) Installation and commissioning of screw steam compressor and control system;

    3) Provide equipment list.

    4) Relevant supply and installation data of equipment.

    4 project benefits

    Supporting equipment for the project: 1 set of screw steam compressor unit;

    The main economic and technical indicators of the project are as follows:

    ITEM

    UNIT

    Indicators

    Unit parameters

    Steam pressure after compression :

    MPa.A

    0.45

    Steam temperature after compression :

    145

    Compressed steam volume :

    t/h

    4

    Annual operation time of unit :

    h

    8000

    Electricity consumption

    Unit operating power :

    kW

    650

    Annual power consumption :

    10000kW.h

    520

    Annual power consumption cost (0.10  USD  / kWh)

    10000USD/year

    52

    Water consumption

    Industrial water volume (circulating water, temporarily excluded from consumption)

    TON/YEAR

    0

    Softening water volume (circulating water, not included in consumption temporarily)

    TON/YEAR

    0

    Desuperheating water volume

    TON/YEAR

    4000

    Consumption cost of desuperheating water (water price 2USD/ ton )

    USD/YEAR

    4000

    Steam recovery

    Annual steam recovery of unit

    TON/Year

    32000

    Unit steam recovery income (150USD/ ton)

    USD/YEAR

    640

    Total economic benefits

    USD/YEAR

    600000

    5. Conclusion

    1. The screw steam compressor is used to recover low-pressure steam, reduce the emission of low-quality steam in enterprises, and realize the secondary recycling of energy.

    2. Because the whole thermodynamic system of screw steam compressor is simple, the equipment can be directly transformed on the basis of the original pipe network system, so the whole field work quantity is small and the equipment covers a small area.

    3. Screw steam compressor has simple structure, no complex parts, long service life, low maintenance cost, obvious economic benefits and short return on investment.

    打印本页 | 关闭窗口
    [上一篇]:信然多台250KW永磁变频螺杆空压机助力威海新能源材料集团
    [下一篇]:大规模电解水制氢系统都由哪些部分组成?

Copyright 2014-2015 信尔胜机械(江苏)有限公司 版权所有 苏ICP备2020067664号 技术支持:仕德伟科技

【信尔胜集团】--信尔胜机械(江苏)有限公司 专业的螺杆真空泵,节能空压机,螺杆鼓风机,水井钻机,制氮机,永磁变频空压机,低压空压机,两级压缩空压机,压缩机,空分设备,膨胀发电机,离心压缩机,柴油空压机,防爆空压机,氢能源设备,激光切割机等产品制造商